A volume unit for project planning
How do you calculate cubic yards?
For a rectangular volume, multiply length × width × height and convert the result to yards. For a uniform material layer measured in square feet and inches, use cubic yards = square feet × depth in inches ÷ 324. The calculator keeps geometry separate from material density and ordering assumptions.
Cubic-yard formula
One cubic yard is a cube that measures 3 feet on every side, so it equals 27 cubic feet. A layer formula uses 12 inches per foot and 27 cubic feet per cubic yard:
yd³ = length (ft) × width (ft) × height (ft) ÷ 27yd³ = area (ft²) × depth (in) ÷ 3241 yd³ = 27 ft³ = 0.764554857984 m³When the input uses yards or meters, the calculator converts the dimensions before multiplying. NIST lists the cubic-yard and cubic-foot factors used for the metric equivalent in its conversion tables.
Unit reference: NIST Guide to the SI conversion factors.
Calculate from area and depth
Measure the surface area that will receive a uniform layer, then measure the planned depth. If the area is in square feet and depth is in inches, divide the product by 324. If the outline is irregular, split it into non-overlapping sections, add their areas, and keep different depth zones separate.
For example, 1,000 ft² at 3 inches gives 1,000 × 3 ÷ 324 = 9.25926 yd³. This is a geometric volume; it is not a recommendation for how thick a driveway, bed, or base should be.
Worked example: 12 ft × 10 ft × 2 ft
These editable starting values illustrate the three-dimensional method:
| Volume in cubic feet | 12 × 10 × 2 = 240 ft³ |
|---|---|
| Cubic yards | 240 ÷ 27 = 8.888889 yd³ |
| Cubic meters | 8.888889 × 0.764554857984 = 6.796043 m³ |
The result is not rounded up to a truckload, bag, or supplier order because those quantities depend on the product and seller.
Volume versus material ordering
Cubic yards describe geometric volume. Ordering material may require a separate allowance for compaction, settling, cut loss, voids, or supplier loading practice. Density is needed for weight, and package yield is needed for bags or boxes. Keep those values editable and sourced rather than silently adding a universal percentage.
When you need these material-specific inputs, use the Bulk Material Calculator. It keeps the base volume, optional bag count, user-supplied density, and price estimate separate.
Limits of the estimate
This page supports rectangular dimensions and a uniform area-depth layer. It does not calculate curved or sloped solids, determine structural dimensions, select a material, or verify local construction requirements. Split complex geometry into supported sections or use a shape-specific tool.
Cubic yards calculator FAQs
How many cubic feet are in a cubic yard?
One cubic yard equals 27 cubic feet because 3 × 3 × 3 = 27.
How do I calculate cubic yards from square feet?
You also need depth. With square feet and inches, multiply area by depth and divide by 324.
Should I round cubic yards up?
The calculator shows the geometric result without rounding to a load or package. Apply a supplier or project-specific ordering rule separately.
Does this calculator include compaction?
No. Compaction and settling depend on the material and project. Keep any allowance separate and use a documented specification.
Can I use this for a driveway or garden bed?
Yes for the area-and-depth arithmetic when you already know the area and planned depth. It does not choose a suitable depth or material.
How do you calculate cubic yards of concrete or soil?
Multiply the measured area by depth in inches and divide by 324, or multiply three dimensions in feet and divide by 27. Keep concrete or soil ordering allowances separate from geometric volume.